Frame and Trusses: The House Stands Up
- Michael
- Framing trusses
- November 6, 2026
For months the house has been a flat grey rectangle. Then the frame went up, and in a few days it turned into rooms, doorways and a roofline you can stand under.
The numbers
- 103 m of external wall frame
- ~105 m of internal walls
- 2.9 m ceilings throughout
- 340 m² under roof
Walking the slab with chalk lines is one thing. Walking through actual doorways is something else.
Why 140mm LVL frame
We went with an 140mm LVL frame. It’s straight, it stays straight, and it doesn’t twist or cup as it dries out the way sawn pine can. With 2.9 m walls and a lot of big glazing, straight matters. A frame that’s out of plumb or out of square causes problems for every trade after it: plasterers, cabinetmakers, and above all the window installer. The use of LVLs, increase to 140mm and straighness requirements added around $4k extra, Paying a bit extra now is cheaper than shimming things later.
The reason for the 140mm externals is purely thermal driven, it’ll allow us to put in 2 layers of insulation plus a air cavity which will greatly increase thermal efficiency and comfort.
I encoded the tolerances (no more than 3mm, over 4m spans and if out of tolerance delivery would be rejected) into the construction drawings and as a result the timber supplier provided us with everything perfectly straight and not cuped. Our carpentered who has 20+ years experience commented that he’s impressed with the supply quality.
Airtightness starts at the bottom
The join between the bottom plate and the slab is one of the biggest air leaks in a typical house, and it’s almost impossible to fix once the walls are lined.
So I supplied the sole plate foam gaskets and sealants myself and put them in alongside the frame installer as each wall went down. The added benefit of working alongside the chippies was I could instantly answer their questions (and they’ll a lot) and we made a few small tweaks along the way.
Here’s the gasket applied to an edge with Orcon sealant applied:
And how it looks once the frame is sitting a top, notice there is about 20mm overhang on the outside edge of the gasket for the external weatherproof wrap to be attached too.
The inside walls also all have a gasket, but I used a different type of IXPE polyolefin high density foam given they won’t be subject to water, and has some increased soundproofing qualities.
Trusses start to take shape
Once the trusses were on, the shape of the house finally made sense: the rooflines, the raked sections and how the house sits in the site cut.
The roof was designed and supplied by Oxley Frame & Truss in Moss Vale and they use MiTek software suite. I got a hold of the MiTek Viewer MMDL file from them and reverse engineened it’s data format and created a Sketchup importer. I’ll add this to my as-built documentation, but also allows me to model cabling trays and figure out how we’re going to do some cable routing and cable management/tidy.
The roof is Colorbond, and I’m putting the Pro Clima roof wrap down myself under the sheeting. Like the gasket, it’s a job I’d rather do slowly and carefully than have rushed.
The raked ceiling isn’t up yet, they’ll go in on Sat/Monday.
An open frame (on purpose)
There’s no structural sheathing on the walls, so the wrap has to work without a rigid backing. That ruled out self-adhered membranes like Pro Clima Adhero. We’re using Pro Clima Solitex Extasana as the wall membrane, with Foilboard outside it. Pro Clima Mento will go on the roof.
This all goes on next.
Windows aren’t going in at this stage
The windows are here, but they’re not going in just yet.
The plan is to wrap the Pro Clima and fuss over the details, getting everything perfectly taped and sealed. Foilboard will then go across the main areas of the walls and we’ll leave a generous margin around every window opening. Then the windows will go in, getting taped properly, and the insulation is filled in around them.
What’s next
- Finish the catherdal/raked ceiling
- Pro Clima wall and roof membrane and Foilboard to the walls
- Windows (eventually)
- Rough-in for services and cable management/trays installed.
More soon, and the live stream shows what’s happening on site in the meantime.